What a host community was promised, what was permitted, what is alleged, and what is still unknown. The builder is xAI, acquired by SpaceX in February 2026 and now operating as SpaceXAI. Every line below is labelled by the kind of evidence it is.
| Item | Evidence type | Detail | Date | Source |
|---|---|---|---|---|
| Ownership | reported | Built by xAI (X.AI Corp.). SpaceX acquired xAI in an all-stock deal on 2 Feb 2026; the entity is reported as SpaceXAI LLC (branded SpaceX Super Intelligence since Oct 2026). Local operating LLC for Colossus 1: CTC Property LLC; Southaven turbine site: MZX Tech (subsidiary). | 2024-2026 | Wikipedia (SpaceXAI; Colossus), TVA reporting primary record pending |
| Colossus 1 site | reported | Former Electrolux factory, 3231 Paul R. Lowry Road, Southwest Memphis (leased by CTC Property LLC). | 2024 | TVA board coverage primary record pending |
| Colossus 2 site and size | independent estimate | 5420 Tulane Rd, Memphis 38109 (Whitehaven). Epoch estimates current power 946 MW. SpaceX S-1 (CIK 1181412) describes a first cluster of ~110,000 GB200 processors at ~210 MW (as quoted by Epoch). | 2026-11 | Epoch AI Frontier Data Centers |
| Grid power | official decision | TVA board approved 150 MW for the Memphis site on 7 Nov 2024 (MLGW request); a further 150 MW reported approved Feb 2026, subject to conditions. | 2024-11-07 | WREG; DCD primary record pending |
| Air permit, Colossus 1 | administrative record | Shelby County Health Department permit for 15 turbines (2 July 2025). Appeal by NAACP and Young, Gifted & Green dismissed as moot by the Memphis and Shelby County Air Pollution Control Board (reported Dec 2025; date to confirm). | 2025-07-02 | SELC; Commercial Appeal primary record pending |
| Southaven turbine plant | official decision | MDEQ permit (Mar 2026) for a 41-turbine plant; MDEQ Permit Board upheld it on 10 Nov 2026, rejecting the NAACP appeal. Further challenge possible. | 2026-11-10 | Action News 5; Memphis Report primary record pending |
| Clean Air Act suit | allegation | NAACP (represented by SELC and Earthjustice) sued xAI and MZX Tech (Apr 2026) alleging turbines ran without required permits. DOJ moved to intervene (Jun 2026). No adjudicated finding identified. | 2026-04 | Earthjustice primary record pending |
| Tax incentives | company claim | Greater Memphis Chamber: investment made 'without any tax incentives.' No PILOT or abatement identified in reviewed records; tax bills not obtained. Mississippi: Southaven uses standard state data-center incentives. | 2025-2026 | Secondary reporting primary record pending |
| Local revenue designation | reported | Memphis City Council reported to have designated 25% of xAI's Memphis tax revenues for nearby communities. Ordinance text not obtained. | 2025-2026 | Secondary reporting primary record pending |
| Water | company claim | Pledge of an ~$80M greywater recycling plant; reported paused in 2026. Capacity and status unverified. | 2026 | Wikipedia (Colossus) primary record pending |
| Jobs | company claim | Colossus 2: 200 to 400 jobs (xAI executive). No payroll records. | 2025-2026 | Secondary reporting primary record pending |
Fiscal ledger
A net fiscal figure cannot be computed yet.
A net fiscal figure cannot be computed: core revenue and cost inputs are missing. No NPV is shown. The ledger shows which inputs exist. “Not identified in reviewed records” is not the same as “none”.
Public revenue
- Incremental property taxes collected
- not obtained Shelby County Trustee and Assessor records not yet retrieved.
- Sales and other taxes
- not obtained
- PILOT receipts
- none identified in reviewed records Absence of evidence is not evidence of absence.
- Fees
- not obtained Permit fees are small and not yet tallied.
Public costs
- Grants and incentives
- none identified (Memphis); standard state incentives (Mississippi, unquantified)
- Public infrastructure
- not obtained Who bears MLGW grid upgrades (ratepayers vs company) not established.
- Incremental services
- not obtained
- Public risk exposure
- not obtained
Non-fiscal welfare ledger (not monetized)
- Air quality: permits issued; allegations of unpermitted operation pending; no health study identified.
- Water: recycling plant pledge, status unverified.
- Reliability and rates: not assessed.
- Noise, land use, community disruption: not assessed.
When records arrive, a discounted scenario will use NPV = Σ (incremental receipts − incremental public costs) / (1 + r)^t, with low, base and high inputs and explicit jurisdiction (City of Memphis, Shelby County, MLGW ratepayers kept separate).
Comparable places
Four other U.S. host sites, same evidence standard.
Chosen from Epoch's tracked facilities to cover an OpenAI/Stargate site, an established cluster, a smaller host community and a utility-heavy build. Local fiscal and employment dossiers for these are not yet assembled.
| Site | Address | Power (MW) | Capex (2025 $B) | Owner / users | Latest status note |
|---|---|---|---|---|---|
| Colossus 2 | 5420 Tulane Rd, Memphis, TN 38109 | 946 | 35.8 | SpaceXAI / Anthropic, Cursor, SpaceXAI | 2026-06-15: The site is estimated to have at least ~830 MW of GPU server power, with at least "at least 220,000 additional GB300 processors and over 400 additional megawatts of compute power", corresponding to th… |
| OpenAI Stargate Abilene | 5502 Spinks Rd, Abilene, TX 79601 | 824 | 31.2 | Oracle / OpenAI | 2026-11-01: Buildings 7-8 are estimated to be operational. On March 24, Building 8 roughly looked like where Building 3 was in September. Building 3 is estimated to be operational in April, 7 months later. This n… |
| Anthropic-Amazon New Carlisle | 55001 Larrison Blvd, New Carlisle, IN 46552 | 1,037 | 39.3 | Amazon / Anthropic | 2026-10-19: Buildings 17-18 are operational. This is an estimate based on a rule of thumb of "operational 5 months after roof is complete", assuming the roofs took one more month after 2025-12-23. Also added four… |
| Microsoft Fairwater Atlanta | 1435 Hwy 54 W, Fayetteville, GA 30214 | 636 | 24.1 | Microsoft / OpenAI, Microsoft | 2026-06-14: Building 3 and 4 are operational.… |
| Google Pryor (North) | 4581 Webb St, Pryor, OK 74361 | 368 | 13.9 | Google / Google DeepMind | 2026-09-06: Building 2 is operational, confirmed via RAAD drone imagery of spinning cooling tower fans on September 8th.… |